Alternative Design for a bridge rested on raft underwater surface instead of 50 meters piles depth, The bridge is 80 meters long divided into 10 meters bays

Structure system type:

  • Super structure: Girder Bridge

  • Sub structure: Piers on raft 

Programs used:

  • Csi Bridge V.19 ≫ Modelling, analysis and design bridge deck

  • ETABS 2016 ≫ Modelling, analysis and design vertical element against earthquack

  • Tekla Tedd >> Check crack width for bridge elements

  • AUTOCAD 2019 ≫ Detailed Structural Drawings

  • Microsoft Word 2017 >> Making detailed calculation note

  • Microsoft Excel 2017 >> Making bill of quantities 

Challenges: ​

  • Loads distribution on the soil structure

  • Required concrete weight to prevent floating of concrete raft